Jump to content

ohnoitsewan

Gold Members
  • Posts

    3
  • Joined

  • Last visited

Posts posted by ohnoitsewan

  1. 29 minutes ago, buchan30 said:

    really hope it isn’t livingston.
     

     

    A major refurbishment of the bridge that carries the eastbound slip road off the M8 at Junction 3 near Livingston over the A899 is planned to start early in 2023 for six months.

    The reinforced concrete structure, which was originally built in 1970, will benefit from a £1.3m upgrade in line with modern standards, ensuring its long-term use and safety for motorists.

    The nature of the works means the slip road will be closed from mid-February for approximately five months.  Clearly signed diversion routes will maintain access to Livingston from the M8 coming from the west and underline that the town is very much open for business.

    The diversion into Livi from the M8 only adds 15 minutes to your drive. It’s still completely accessible 

×
×
  • Create New...