FairWeatherFan Posted November 18, 2021 Share Posted November 18, 2021 Stumbled across this recent tweet from Rossvale. By the sounds of it they're trying to make the move to Petershill permanent. 0 Quote Link to comment Share on other sites More sharing options...
parkcircus Posted November 18, 2021 Share Posted November 18, 2021 On 17/11/2021 at 14:21, Ginaro said: They are 15m according to the planning application, though the pitch is sloped towards the stand. There no height requirement on floodlights, depending on light type heights will be different, I think Medda and Talbot have Halide, normally 16-18m LED can be lower around 14-15 0 Quote Link to comment Share on other sites More sharing options...
Aqy Posted November 22, 2021 Share Posted November 22, 2021 Planning permission for Pollok's toilets was granted on Friday - https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?keyVal=R0JVX5EXIIJ00&activeTab=summary Haven't seen or heard anything more about the application for planning permission for floodlights though? 3 Quote Link to comment Share on other sites More sharing options...
paul-r-cfc Posted November 22, 2021 Share Posted November 22, 2021 Planning permission for Pollok's toilets was granted on Friday - https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?keyVal=R0JVX5EXIIJ00&activeTab=summary Haven't seen or heard anything more about the application for planning permission for floodlights though?Would assume that could take a bit longer as it's likely there will be at least one objection that needs considered. None were received for the toilets. More substantial work also so more things to take into account. 0 Quote Link to comment Share on other sites More sharing options...
energyzone Posted December 2, 2021 Share Posted December 2, 2021 How long does it typically take for a licence to be granted after the initial application, assuming everything is approved?I know the ground has to be up to standard but as others have previously said, this is only a small part of the overall conditions. Is the ground inspected in one day? 0 Quote Link to comment Share on other sites More sharing options...
FairWeatherFan Posted December 2, 2021 Share Posted December 2, 2021 (edited) 20 minutes ago, energyzone said: How long does it typically take for a licence to be granted after the initial application, assuming everything is approved? I know the ground has to be up to standard but as others have previously said, this is only a small part of the overall conditions. Is the ground inspected in one day? Recently, the ground would be inspected around this time of year. Then if things are needing done the club would have until some time in February to get things sorted. The February licencing committee meeting is intended to be the last opportunity for new clubs to be licenced for the following season. If they give the okay it would be forwarded to the SFA's AGM. That's roughly how things are meant to go these days really only happened one year in practice as COVID saw that timeline extended. EDIT: Which explains why Pollok are aiming to get what they need done by February. https://www.pollokfc.com/2021/10/27/pollok-fc-sfa-licensing-update/ Edited December 2, 2021 by FairWeatherFan 1 Quote Link to comment Share on other sites More sharing options...
Aqy Posted December 3, 2021 Share Posted December 3, 2021 Planning application for the Pollok floodlights has been received by GCC - 21/03449/FUL. 3 Quote Link to comment Share on other sites More sharing options...
theesel1994 Posted December 7, 2021 Share Posted December 7, 2021 Largs Thistle have a planning application in for floodlights. https://www.eplanning.north-ayrshire.gov.uk/OnlinePlanning/applicationDetails.do?activeTab=documents&keyVal=R03WT5LELWE00 2 Quote Link to comment Share on other sites More sharing options...
Meadowman Posted December 7, 2021 Share Posted December 7, 2021 33 minutes ago, theesel1994 said: Largs Thistle have a planning application in for floodlights. https://www.eplanning.north-ayrshire.gov.uk/OnlinePlanning/applicationDetails.do?activeTab=documents&keyVal=R03WT5LELWE00 Maybe they should concentrate and get their dressing rooms up to a better standard 0 Quote Link to comment Share on other sites More sharing options...
AsimButtHitsASix Posted December 8, 2021 Share Posted December 8, 2021 12 hours ago, theesel1994 said: Largs Thistle have a planning application in for floodlights. https://www.eplanning.north-ayrshire.gov.uk/OnlinePlanning/applicationDetails.do?activeTab=documents&keyVal=R03WT5LELWE00 I've played there a few times and always thought it had floodlights. I'm pretty sure I have memories of playing there under floodlights. Some mad Mandela Effect shit going on there. 0 Quote Link to comment Share on other sites More sharing options...
LongTimeLurker Posted December 8, 2021 Share Posted December 8, 2021 They probably already have training lights that don't provide the lux values needed for licensing. 0 Quote Link to comment Share on other sites More sharing options...
Inanimate Carbon Rod Posted December 9, 2021 Share Posted December 9, 2021 Whats the script with petershill park? Heard the other night Rossvale hoping to make it their permanent home ground, partick thistle run it etc? Are peasy still planning on playing there too? 0 Quote Link to comment Share on other sites More sharing options...
FairWeatherFan Posted December 9, 2021 Share Posted December 9, 2021 It certainly seems to be their aim. Social media wise they're embracing the idea of being a "Glasgow" club. 0 Quote Link to comment Share on other sites More sharing options...
energyzone Posted December 10, 2021 Share Posted December 10, 2021 I'm not sure how they expect to attract fans if they are going to be another generic Glasgow club, in the same vein as Glasgow United. It's hard enough to attract fans in the city and the lack of a local identity isn't going to help. 0 Quote Link to comment Share on other sites More sharing options...
AsimButtHitsASix Posted December 10, 2021 Share Posted December 10, 2021 3 hours ago, energyzone said: I'm not sure how they expect to attract fans if they are going to be another generic Glasgow club, in the same vein as Glasgow United. It's hard enough to attract fans in the city and the lack of a local identity isn't going to help. Possibly looking to be a 'wee Partick' in the way St. Rochs are a 'wee Celtic' 1 Quote Link to comment Share on other sites More sharing options...
LongTimeLurker Posted December 10, 2021 Share Posted December 10, 2021 14 hours ago, Inanimate Carbon Rod said: Whats the script with petershill park? Heard the other night Rossvale hoping to make it their permanent home ground, partick thistle run it etc? Are peasy still planning on playing there too? Is it not the park that some of the Division 4 clubs like Finnart and BSC Glasgow are using that is run by Partick Thistle? 0 Quote Link to comment Share on other sites More sharing options...
Inanimate Carbon Rod Posted December 10, 2021 Share Posted December 10, 2021 1 minute ago, LongTimeLurker said: Is it not the park that some of the Division 4 clubs like Finnart and BSC Glasgow are using that is run by Partick Thistle? I saw some guys behind the counter at petershill with thistle trackies on running the place? Also got told that by some folks at the game too? Very much could be wrong though. 0 Quote Link to comment Share on other sites More sharing options...
FairWeatherFan Posted December 10, 2021 Share Posted December 10, 2021 It would appear to be both. https://ptct.org.uk/pitch-booking/ 0 Quote Link to comment Share on other sites More sharing options...
glensmad Posted December 10, 2021 Share Posted December 10, 2021 Petershill Park is run by Partick Thistle Charitable Trust, Petershill and Rossvale are both tenants. 1 Quote Link to comment Share on other sites More sharing options...
Ginaro Posted December 14, 2021 Share Posted December 14, 2021 On 22/11/2021 at 10:54, Aqy said: Planning permission for Pollok's toilets was granted on Friday - https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?keyVal=R0JVX5EXIIJ00&activeTab=summary Haven't seen or heard anything more about the application for planning permission for floodlights though? On 22/11/2021 at 18:46, paul-r-cfc said: Would assume that could take a bit longer as it's likely there will be at least one objection that needs considered. None were received for the toilets. More substantial work also so more things to take into account. https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=R2LVRREXK9600 Going for the full 300 lux needed for the SPFL, but with only four columns - light spill towards the flats might be an issue (50-75lux), seems higher than other installations we've seen recently at the same distance away. 0 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.